27th April 2016

I requested Loong Sheng and Jacqueline to upload the screen shots of each functions to attach to the documentation. After they uploaded everything, I saved the images and insert them into the document, writing a brief description about it.

20th April 2016

I have been updating the meeting minutes and the members’ diary into the blog. In today’s meeting, I presented the logo I have been working on the past week.

20th April 2016

I have been working on the documentation. The web portal and mobile application couldn’t link to each other during the meeting. Jacqueline decided to try to fix the bug she found while attempting to connect the web portal. Wei Tian has completed the logo of the project, she has uploaded into the Facebook group.

20th April 2016

In this meeting, I tried to connect the system with the mobile application. The connection was not able to form and we tried a few times then found out there was a bug in the mobile application. Jacqueline decided to go back and fix the bug and we can continue the task we were given. Wei Tian has presented the logo and have asked me to include it in the web portal.

20th April 2016

In today’s meeting, I tried to connect the application to the web portal system. The connection was not working properly and we were not able to connect. After a few attempts, I found out there was a bug in the mobile application. We discussed about the problem and I suggest to go back try to fix it. Wei Tian presented her logo idea.

General Meeting Minutes 13

Final Year Project Meeting Minutes 13

Venue: INTI Gallery

Date: 20th April 2016

Time: 3:00 pm – 3:43pm

Participants: Jacqueline Tan Suet Ping, Jax Lee Long Sheng, Alan Chow Wing Lun, Yap Wei Tian

 

Jacqueline and Loong Sheng have completed the changes for both their parts while Wing Lun and Wei Tian are working on the documentation. The group is trying to connect both the system together however there was a problem that both was not able to connect. The group tried to come up with a solution but it still couldn’t work. After trying a few more times, the group found there was a bug in the mobile application. Jacqueline stated that she will go back and try to fix the bug while the reaming members can continue the task that were given. Wei Tian presented the logo design to the group. The following is the logo design for the project.

logo
Beautify Logo

 

The next meeting is to be confirm.

16th April 2016

In the past week, I assist Loong Sheng to change the design of the web portal to make it synchronize with the mobile application. First, I drafted out the design and labeled all the colour code and icons for him. I sent him the draft and explain to him what changes I made to the design.

15th April 2016

The duty roster and resource planning is nearly done. Wei Tian has assist me on the design of the web portal. She drawn out drafts and labeled all the colour code for me to make the changes. I sent a print screen to the Facebook group we have to update all the members.

12th April 2016

In the past week, I focus on developing the geo location feature in the mobile application. I have also changed the colour theme of the mobile application to a purple and grey theme.